State Water Resources Control Board poised to release a final draft of the Industrial General Permit by April 2013

The State Water Resources Control Board is poised to release a final draft of the Industrial General Permit by April 2013. Public comments will be received for 45 days, and a formal workshop will be held on May 8, 2013.

For more details visit: http://www.waterboards.ca.gov/water_issues/programs/stormwater/

Trackbacks (0) Links to blogs that reference this article Trackback URL
Comments (0) Read through and enter the discussion with the form at the end